Result Information for Audit Number: 81682
Customer: Apio, Inc. Ranch: Zest Hwy 1 Ranch Grower: Zest Farms
Produce List: Broccoli
Crew Name Or Number: N/A
Foreman Or Contact Person: Hector Zepid
City / Location:
Audit Start: 05/08/2008 10:45
Audit End: 05/08/2008 12:45
Audit Score In Percentage: 95%
Average Primus Score: 97%
Severity
Category
Question Number
Question
Desired Answer
Possible Score
Given Answer
Your Score
Recommendation
C
Adjacent Land Use
04.01
Is the adjacent land to the growing area a possible source of contamination from intensive livestock production (e.g. feed lots, dairy operations, poultry houses, meat rendering operation)? If No, go to 4.02
No
10
Yes
0
Adjacent refers to all parcels of land next to the growing operation or within a distance where the crop in question may be affected. Examples of intensive livestock production are cattle feed lots, dairy operations, poultry houses, etc. Consideration should be made for the topography of the land for runoff, potential flooding issues, and prevailing winds for manure related dust issues.
C
Food Security
09.01
Are measures taken to control vehicle access to the growing area? (specified access roads, furrows, etc)?
Yes
5
No
0
http://www.usda.gov/documents/PreHarvestSecurity_final.pdf
C
Food Security
09.03
Are entrances to ranch-level roads restricted by gates, chains, guard stations, etc.?
Yes
5
No
0
http://www.usda.gov/documents/PreHarvestSecurity_final.pdf
C
Food Security
09.09
Are company supervisors required to undergo documented security training with attendance records?
Yes
5
No
0
http://www.usda.gov/documents/PreHarvestSecurity_final.pdf
C
Crop Protection
07.13
Have documented policies and/or procedures been developed for the monitoring of crop protection application equipment (e.g. calibration procedures, inspections, replacement)?
Yes
10
No
0
Procedures may include regular calibration, verifications, replacement, and maintenance of the crop protection equipment.
C
Irrigation/Water Use
06.03f
Are the microbiological tests current and conducted at the required and/or expected frequencies?
Yes
15
No
0
One sample per water source should be collected and tested prior to use and then ideally monthly, or at frequency relative to the associated risks.*